March 2-7 2020 Im assigning the technician to repair the reports of the subscribers and check the vacant ports of cabinet 13
Author Archives: kimladrido
My 3rd week of ojt
Feb 24-28 2020 As usual, i’m calling out the subscribers to check their telephone and internet connections. And closing some completed reports. Feb 25 2020 Feb 25 is our holiday because it’s the EDSA revolution anniversary.
My 2nd week of ojt
Feb 17 2020 Changing ports for voice/telephone line. Feb 18 – 20 2020 Calling out subscribers for line validation. Feb 21 2020 We participated at the fire and safety drill. Feb 22 2020 Removing of dead/disconnected wires.
My First week on my On-The-Job-Training
On my First Week of Ojt they orient us on how to remove and organized the wires and how to remove the dead wires. Some wires are tangled and hard to remove because they are covered with the other wires.